How long does it take from design to shipping?
May 27, 2026
If you provide the design drawings, we will spend approximately one week designing the experimental mold within 10 days, confirm the light spot characteristics, and produce the final mold in about 25 days. Once you receive the confirmed mold ready for production, the project can be completed through mass production in just 10-12 days.As a dedicated optical lens manufacturer with a 16-year Shenzhen factory, we keep tight control over every stage to ensure on-time delivery.


